Solution and design study regarding the protection of Ø 12″ and Ø 14″ Cartojani crude oil transport pipelines, route located between the Triaj Brazi railway lines and Ghighiului street, Ploieşti city, over a total length of 110 m
Securing the 12” and 14” Cartojani-Ploiești pipelines at the crossing of the Cricovul Dulce stream
Replacement of manifolds and valves at the work point CONPET S.A. – OIL TERMINAL depot Constanța
Replacement of a section of the Ø12 3/4’’ Cartojani-Ploiești crude oil pipeline, total length approx. 250 m, Mihai Bravu Street underpass area-LUKOIL
Replacement of the Constanța – C1 pipe section, Ø14”, Cuza Vodă area, approx. 550m
Protection of 24”, 20” and 14” crude oil pipelines at the intersection with the designed roads
Protection of 14” and 20” crude oil pipelines
Protection of 6 5/8” and 8 5/8” crude oil pipelines
Replacement of sections, of approx. 1000 ml in total, of the Ø 10”, 12”, 14” crude oil transport pipes, inside the OMV PETROM – Brazi refinery
Securing the undercrossing of the Targul River with the natural gas pipelines DN500 Schitu Golesti – Slatioara and DN500 Schitu Golesti – Stalpeni, in the area of Furnicosi, Arges County
Securing the natural gas pipelines DN500 Filipesti – Razvad and DN400 Filipesti – Moreni, undercrossing of the Cricovul Dulce river, I.L. Caragiale area, Dambovita county
Protection of natural gas transmission pipeline F2 DN 500 Stalpeni Pitesti Sud
Bringing the gas delivery pipeline to compliance at SRM Carani
Couponing 3,950 m of gas collector Calacea-Sannicolau Mare degassing
Godevil receiving station DN150 PN63 Nadlac
Need Help with Easier Industrial Solutions? We Are Experts!